Open Access

Table 2.

Factor levels.

Factor Levels
Number of jobs 20
50
100
200
500
Number of machines (m) 5
10
20
Range of processing times (p) U [1, 99]
Range of transportation times (Tf + Tb) U [1, 30]
Skipping probabilities 0.1
0.4
Range of time interval between two consecutive PM (TPM) U [200, 300]
Range of duration of PM operations (TPM) U [1, 50]
U [1, 99]
U [1, 150]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.