Issue |
Manufacturing Rev.
Volume 7, 2020
|
|
---|---|---|
Article Number | 30 | |
Number of page(s) | 9 | |
DOI | https://doi.org/10.1051/mfreview/2020021 | |
Published online | 08 September 2020 |
Research Article
Experimental investigation of process parameters in WEDM of Al 7075 alloy
1
Production Engineering Department, Jadavpur University, Kolkata 700032, India
2
Mechanical Engineering Department, NITTTR-Kolkata, Kolkata 700106, India
* e-mail: mandal.kingshuk1@gmail.com
Received:
18
March
2020
Accepted:
13
July
2020
Process parameters selection is a critical task in wire electro-discharge machining (WEDM). The parameter settings would vary when a material to be machined is changed. In the present study, experimental investigation has been carried out for appropriate selection of process parameters in WEDM of Al 7075. It has been perceived that pulse on time (Ton), arc on time (Aon) pulse off time (Toff), arc off time (Aoff), servo sensitivity (Sc), wire tension (Wt) and servo voltage (Sv) are the major influencing factors on machining speed (Vc), corner error (Ce) and surface roughness (Ra) for this alloy. It is also observed that selected seven process parameters are essential for effective machining of Al 7075 alloy. Finally, three-dimensional (3D) surface topography has been analysed to determine the characteristics of the machined surface.
Key words: Wire electro discharge machining / Al 7075 alloy / machining speed / corner error / surface roughness
© K. Mandal et al., Published by EDP Sciences 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License (https://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.